The construction of this project included pits that were dug ten-feet deep under the exterior walls and the existing foundation rock was removed. Concrete piers were created in each of the pits. A three-foot strip of plaster ceiling was removed along all exterior walls, exposing the floor joists and masonry-bearing pockets. Damaged joist ends were repaired and reinforced with steel plates and the ceiling was repainted. New electrical wiring replaced the outdated 1940s system and bathrooms were made wheelchair-accessible. A new elevator and lifts were added to increase accessibility throughout the building.