This state-of-the-art facility includes a performing arts auditorium, which seats 450 and 95 instructional spaces on 62 acres. This facility also includes a library/media center and a 17,700-square foot dining and kitchen area. A modern fiber-optic technology system was installed to provide data, telephone, a closed-circuit television security system, internet access and energy management systems. The building’s structural system includes steel, cast-in-place reinforced concrete, pre-cast concrete, and engineered wood products. The school makes extensive use of wood materials following a change in state policy that previously prohibited it. Approximately 60 percent of this building is wood construction.
https://www.baldwinshell.com/projects/item/13-el-dorado-high-school#sigProIdc2d9317ec3